STUDIO GENERATORS TIER 4 FINAL
Specifically designed for entertainment industry and special events

copertina

Film directors? Very competent in their work, but very demanding and fussy, sometime foul-tempered. The generator cannot fail. The BRUNO STUDIO generators represent an indispensable help to facilitate their job.

The ideal piece of equipment for the movie industry, where the slightest fluctuations of the frequency could create lights’ alterations that are not visible to the naked eye but which can result from filming...Learn More

Archive

STAGE V
Full range of new generators up to 650 kVA

SA500FQ V BR all

BRUNO has launched new models of generators equipped with STAGE V engines.

The complete range of engines is available for all power ranges, from less powerful generator up to 650kVA...Learn More

Archive

news bruno banda

NEW 70kW ARCHIMEDE BATTERY
FUSTEQ technology meets the versatility of LITHIUM BATTERIES
         
         
  enercubo bis  
BRUNO launches the new latest generation Hybrid CUBE FUSTEQ STAGE V compliant hybrid generator (also available with Tier IV Final engines) on the market.
 
Thanks to the synergy between BRUNO and Archimede Energia (BGG Group), the technology of FUSTEQ generators integrates with the versatility of the new energy-dense ÆnerBox® lithium batteries, available up to a maximum power of 70kW and designed for the specific needs of the telecommunications, services, rental and agricultural markets.
 
The Hybrid CUBO generator (22kVA standby) mounts six ÆnerBox® lithium batteries that guarantee high performance in terms of power and reliability with a photovoltaic panel (optional) and an EV CCS2 charging socket for charging AC electric vehicles.
This product uses the control of charging in DC current through a variable speed system and integrates the management of bidirectional inverters that allow the discharge and charging of batteries from the power grid and photovoltaic panels.


The strong point of these new batteries is the technology entirely Made in Italy based on a software conceived and developed by our Research and Development department; also, the Battery Management System has also been designed and built internally thanks to specific electronic and mechanical expertise.

Other key features, such as the high number of charging cycles, the absence of maintenance, the ability to perform rapid partial charges and the wide temperature range, make this product the best solution for energy storage.

Like all our products, customized solutions are available for battery autonomy, generator power, type of equipment (in canopy or container) and coupling with photovoltaic panels according to different applications and market segments.

Contact us for more information!

 
  hybrid cubo BR C batteria archimede new
   
   

news bruno banda

CORONAVIRUS HEALTH EMERGENCY
         
         
  Foto

 

 

 

BRUNO made it’s contribution in the particular health emergency period.
The supply of generating sets by BRUNO and other companies belonging to the BGG group involved hospitals and intensive care departments set up in a very short time:

- The new hospital at the Milan Exhibition Center, where a complex and critical facility was built in less than a week, working non-stop;
- The Hospital Camp of Piacenza
- The Hospital of Imperia
- The San Raffaele Hospital of Milan

We have also directly set up systems with our generators in the main hospitals of Marche, Abruzzo, Molise and Puglia in Italy.

BRUNO also has made their contribution in an emergency by donating a pulmonary ventilator to the Ariano Irpino’s hospital center.

Our internal Research and Development department has also contributed to the design of protective visors for healthcare purposes, putting the ingenuity and technical expertise available for the conversion of certain production activities to the benefit of healthcare workers.

 
  162652411 cc455ad1 ca53 4381 ae26 d2035e68ce4c Unknown
   

 

news bruno banda

GBBF 2019
         
         
  C57A7580 1  
logo gbbf trasparente
On 6 and 7 June 2019 the first Gruppo Bruno Business Forum was held in Carpi, in the province of Modena, at the new headquarters of Cev Lab.

150 managers and directors of the various Companies, which in Italy and abroad, are part of the Bruno Group of Grottaminarda, met in the town of Emilia Romagna for a two-day event, which involved them in sharing the activities performed by their respective companies. The meeting was organized with the aim of giving a strong push to develop all the possible synergies between the numerous companies that belong to the Group.

Currently the Holding, which is specialized in the marketing of agricultural and industrial machinery, in the production of generating sets and energy stations, of electromechanical components for the automotive, agriculture and industry sectors, has a turnover of 220 million euros, has 24 production facilities, distributed between Italy and abroad, and 1084 employees, and it has always been investing in research and innovation, to provide its customers with a range of the most complete in the world.

The new Cevlab building, completed at the end of 2018, in which the event was held, is located close to the well known Zadi company in Carpi, acquired by the Group in 2012.

 
  C57A7423 1 C57A7587 1 1
   
   

news bruno banda

BAUMA 2019  - München
news bauma2019


We participated at Bauma 2019, April 8-14.

Get more info on BAUMA

|

Contacts

BRUNO S.r.l.

S.S. 91 Km 0,600
83035 Grottaminarda (AV)
Tel. +39.0825.4210
Fax.+39.0825.445130

Export Department

Tel. +39.0825.421005
Fax.+39.0825.426169

export@brunogenerators.it

Login

Copyright Bruno S.r.l. 2014